
Beneficiary : Petrom
Project : Decomissioning and Ecologizing Equipment
Description : Since 2010, Integralserv has a contract for dismantling and ecologizing obsolete equipment - technological routes, machinery, removal of the thermal insulation, dismantling by cutting and metal recovery welding, waste transport etc.
Beneficiary : Petrom
Project : Execution of Catalytic Cracker Unit
Description : Execution of a new catalytic cracker unit in Petrobrazi Ploiesti refinery, foundations, painting and spraying, drainage routes, installation of new technological equipment, construction of new technological routes, etc.
Beneficiary : ROMPETROL
Project : Rompetrol Revisions
Description : Since 2008, Integralserv participates in the Petromidia Navodari Refinery overhauls.
Beneficiary : Petrom
Project : Crude Oil Discharge Ramp
Description : Dismantling existing metallic structures, site redevelopment, installation of new metallic structures and technological equipment of discharge.
Beneficiary : Petrom
Project : Execution of Technological Routes
Description : Execution of technological routes according to isometric drawings for installations in the refineries Petrobrazi and Arpechim, technical and technological consultancy activities.
Beneficiary : Petrom
Project : Petrom Overhauls
Description : Since 2008, Integralserv participates in the Petrobrazi Ploiesti refinery overhauls.
Beneficiary : Rompetrol-Petromidia Navodari
Project : Upgrade of Catalytic Cracker Unit
Description : Strengthening metal structure of resistance, spraying and painting, execution and strengthening of foundations, drainage routes, installation of new technological equipment, repair existing technological equipment, construction, repairs and installation of new technological routes, column revisions etc.
Beneficiary : Egger
Project : Equipment Maintenance
Description : Since 2009, Integralserv has been providing equipment maintenance for the melamine pal factories in Radauti and Rion Des Landes ( France ) : locksmith works, welding, overhauls and repairs to static and dynamic machinerty, construction of concrete and metal structure buildings etc.
Beneficiary : Schweighofer Holzindustrie
Project : Execution of Heating Equipment
Description : Execution of heating equipment for timber factories in Sebes and Radauti, static and dynamic machinery overhauls and repairs, technological routes, repairs at the main logs transportation equipment.
Beneficiary : JCR-CHRISTOF CONSULTING
Project :Execution of concrete platform and assembly of industrial halls
Description : Foundations, pillars of strength, trusses, sandwich panel walls, various compartmenting etc.
Beneficiary : Lukoil
Project : Lukoil Overhauls
Descriere : Since 2008, Integralserv participates in the Petrotel Ploiesti refinery overhauls.